Modular Bridge
Image Date
November 2nd, 2010
Project Description
We wanted to add some items for overhead objects. These would have been used in a sunken highway with large sidewalls, to add some vertical elements. to the scene. It was also built to have repeating middle sections, so that we could shrink/grow it as needed.
Technologies Used
Other Notes
I believe this was a speed build (1 day / 8hrs). I liked the results, but I don't think it ever saw any action, which was a shame.